Wind turbine technician climbing a tower ladder, viewed from below looking straight up into an overcast sky

112 Turbines.3 States.One Call.

Certified rope-access technicians. Cleared for every major OEM. On-tower within 4 hours of your call — regardless of forecast.

4.2 HRS
Avg. Emergency Response
847
Turbines Serviced — Q4 2025
3.1 GW
Total Megawatts Maintained
IRATA Level IIIGWO Basic Safety TrainingOSHA 10 — WindNERC MRO ComplianceNERC RFC ComplianceNERC TRE ComplianceNERC WECC ComplianceVestas Certified PartnerSGRE Authorized VendorGE Vernova ClearedNordex Certified ContractorFAC-001/002 CompliantMOD-032 ReportingISO 9001 DocumentationIRATA Level IIIGWO Basic Safety TrainingOSHA 10 — WindNERC MRO ComplianceNERC RFC ComplianceNERC TRE ComplianceNERC WECC ComplianceVestas Certified PartnerSGRE Authorized VendorGE Vernova ClearedNordex Certified ContractorFAC-001/002 CompliantMOD-032 ReportingISO 9001 Documentation

Every Logo Is a Site Clearance,
Not a Brochure Claim.

IRATA Level III Certified

All personnel hold current GWO Basic Safety Training and OEM-specific site induction certifications.

V150-4.5 MW Blade Inspection Campaign — Wyoming

312
Blades Inspected
99.1%
Availability Maintained
18 Days
Campaign Duration

Leading edge erosion survey across 104-turbine fleet. All inspections completed within contracted weather window. Composite repairs on 23 blades executed uptower — zero crane mobilizations.

V150 PlatformLEP RepairUptower CompositeNERC MRO
Uptower Composite Repairs
1,240+
No crane mobilization required
Blade Inspections YTD
4,800+
Drone + rope-access combined
Emergency Response Rate
98.7%
On-tower within 4-hour SLA
SCADA-Compatible Reports
100%
Delivered within 24 hrs

Tools We Actually Use
In the Field.

Three documents that O&M directors keep open during planning season. Built from 6 years of multi-OEM fleet maintenance — not from a consulting firm's template library.

Seasonal Maintenance Planner24 pages

52-week scheduling template with weather-hold contingency windows by NERC region.

Blade Inspection Checklist8 pages

IEC 61400-4 compliant inspection form. OEM-agnostic, covers V90 through V236.

NERC Compliance Reference16 pages

FAC-001/002 and MOD-032 obligations organized by balancing authority region.

Free Download
Seasonal Maintenance Planner

Enter your email and we'll send the full toolkit — planner, inspection checklist, and NERC reference sheet — to your inbox within 2 minutes.

No sales calls. Unsubscribe anytime.

No spam
2,300+ downloads
Updated Q1 2026

Tell us about your fleet.
We'll tell you what it needs.

No obligation. We review every submission and respond with a scope outline within one business day — including crew availability for your service window.

Response within 1 business day. No commitment required.